PhaseRotation=RST
States how the charging station is connected to the grid supply.
A combination of:
R (Grid L1)
S (Grid L2)
T (Grid L3)
x (Unconnected)
In the example, the station is connected to grid phases L1, L2, and L3. In that order (not
rotated).
NOTE: A 1-phase, single-EVSE station could have a PhaseRotation of either Rxx, Txx or Sxx.
IMPORTANT: Nodes of type station cannot be set as parents, as they can only be end nodes.
IMPORTANT: The outlet/x/fallback_current parameter will default to 0 A (charging is not possible) by the NANOGRID™
controller if it is missing.
NOTE: Make sure that the combined fallback currents do not assign too much in the event of a local NANOGRID™
controller or network failure.
NOTE: For more information about the fallback and offline behavior, refer to "Offline and fallback behavior" on page
11.

To do before you configure a NANOGRID

1.
Make sure that the NANOGRID™ compliant units are in operation.
2.
Make sure that the units have applicable licenses.
3.
Make sure that the local electrical grid conditions are known.
4.
Make sure that the electrical installation is completed and will not be changed in the near future.
5.
Make sure that the units contain a correct LAN configuration.
6.
Make sure that applicable firmware is in operation. Version R3.11.14 or later is recommended.

To install the nanogrid.ini configuration file

Install the nanogrid.ini file via the CTEK CHARGE PORTAL web interface, a third party CSMS backend, or upload the
nanogrid.ini file through the NANOGRID™ controller web interface, refer to "To install the nanogrid.ini configuration
file through the controller web interface" on page 5.
NOTE: The nanogrid.ini configuration file must only be placed on the controller unit. Failure to install the file on the local
controller unit or failure to limit installation to the local controller unit will result in undesired behavior.
NOTE: If the nanogrid.ini configuration file is written incorrectly the NANOGRID™ controller will send a
StatusNotification with the NgErrorConfiguration error to the CSMS backend, and ignore the file.
To install the nanogrid.ini configuration file through the controller web interface
Refer to the CGC500 INSTALLATION MANUAL for instructions on how to access the web interface on the CGC500
GRID CONTROLLER.
Refer to the CHARGESTORM CONNECTED 2 USER MANUAL for instructions on how to access the web interface on
a CHARGESTORM CONNECTED 2 station.
1.
In the web interface, go to "NANOGRID™" in the left menu.
CTEK E-Mobility AB
installation
TM
1
2.
Select the "Server" tab.
3.
Do one of the procedures that follow.
a
Push the "Choose file" button to open a file dialog window and select the file.
b.
Drag and drop the nanogrid.ini file at the grey "Drag & Drop" area.
4.
Press the "Upload" button to transfer the nanogrid.ini file to the NANOGRID™ controller.
Configuration instructions
2
3
5