Acorn Safety S0701 Istruzioni per l'installazione, il funzionamento e la manutenzione - Pagina 2
Sfoglia online o scarica il pdf Istruzioni per l'installazione, il funzionamento e la manutenzione per Attrezzatura di sicurezza Acorn Safety S0701. Acorn Safety S0701 5. Drench hoses
Installation & Operation Manual
PRELIMINARY STEPS
1. Read the installation instructions prior to beginning the installation.
2. Separate parts from packaging and verify all necessary parts are accounted for and undamaged. Obtain missing or
damaged parts from Acorn Safety prior to beginning installation.
3. Flush water supply lines prior to installation. This will remove unwanted debris from the lines and prevent unwanted
blockages in the safety equipment.
4. In order to comply with ANSI Z358.1, the safety equipment must be inspected periodically. An inspection tag is provided for
documentation purposes.
5. All employees at risk of contamination should be informed and trained in the use of this and any other safety equipment.
The signage provided should be posted appropriately in close proximity to this equipment.
ROUGH-IN
3 1 8 "
(78)
2 3 4 "
(70)
1-11 1/2 NPS
MOUNTING HOLE
SIZE 1-3/8"
S0701
Acorn Safety
a division of Acorn Engineering
Manual #7109-503-001
10 1 2 "
(266)
2 1 8 "
2 3 4 "
(54)
(70)
MOUNTING HOLE
3/8-18 NPT
SWIVEL CONNECTION
Company
3 1 8 "
(78)
2 1 8 "
(54)
1-11 1/2 NPS
SIZE 1-3/8"
S0702
™
Page 2 of 5
10 1 2 "
(266)
3/8-18 NPT
SWIVEL CONNECTION
Revised: 03/22/13