3form SimpleSpec 250.02 Manuale di installazione - Pagina 5

Sfoglia online o scarica il pdf Manuale di installazione per Apparecchiature industriali 3form SimpleSpec 250.02. 3form SimpleSpec 250.02 11.

Ready To Go
SimpleSpec 250.02
Installation
1
Anchor Cable Couplers cont...
d
place a washer under the screw head.
g
Hollow Substrate Installation
Metal
Studs
Drill Ø3/4" (19mm) hole. Minimum
clearance behind wall = 17/8" (48mm)
For more information, please visit 3-form.com or call 800.726.0126
April 2018 | MAN-rTG-250-02 | rEV 002 © 2018 3form, inc. All rights reserved.
tm
e
Torque the screw to 15 Nm.
h
position the metal channel parallel
with the plastic legs. insert the metal
channel through the drilled hole into
the wall cavity.
Installation Manual
f
remove screw.
i
Metal
Studs
pull the metal channel firmly against the
inner wall cavity by tugging the plastic
pull ring.
5