Dixon 5500 Series Istruzioni per la manutenzione e il funzionamento - Pagina 7
Sfoglia online o scarica il pdf Istruzioni per la manutenzione e il funzionamento per Apparecchiature industriali Dixon 5500 Series. Dixon 5500 Series 12. Api rack coupler
These instructions and recommendations are provided to ensure proper operation and long service
life of the Dixon 5500 API rack coupler. Parts are identified by the item numbers on the assembly
drawing and part list.
SUGGUESTED MAINTENANCE SCHEDULE:
1. MONTHLY INSPECTION
Visual inspection of the API rack coupler operation can be done while the API rack coupler is still
on the loading arm. All safety precautions that apply to the use of the API rack coupler must be
followed.
While the API rack coupler is still on the loading arm, visually examine the API rack coupler for any
worn or damaged parts, such as the body (1), sleeve (4), handle (10), bail (18), poppet (5.1), nose
seal (6.3), interlocking cams (13), latch (15), flange bolts, etc, or any other condition that may affect
the operation of the API rack coupler.
Examine the API rack coupler to make sure that the API rack coupler functions well. See Clause 3
in Section "INSTALL API RACK COUPLER TO LOADING ARM" for procedures.
Check the handle (10) for free and easy movement of the opening and closing cycle. Operation of
the handle (10) normally requires limited effort. If operating the handle (10) involves stronger force,
it implies the need to clean and possibly replace the shaft bearing (7) and the shaft (2).
During service time when the line is filled with liquid product, visually check for evidence of
leakage, especially through the shaft seals (7.2, 7.3, 7.4, 7.5 and 28), nose piece seals (6.2, 6.5),
nose seal (6.3) and the flange gasket. Any evidence of leakage means there is a need for further
maintenance.
2. YEARLY INSPECTION
For yearly inspection, the API rack coupler should be removed from the loading arm. See Section
"DISMANTLE API RACK COUPLER FROM LOADING ARM" for procedures of how to dismantle
the API rack coupler from the loading arm. See Section "DISASSEMBLY" for procedures of how to
disassemble the API rack coupler for further maintenance.
It is recommended that all seals (6.2, 6.3, 6.5, 7.2, 7.3, 7.4,7.5 and 28) should be inspected every
12 months. Replace any worn or damaged seals. See Section "REPLACE SEALS" for
procedures.
It is recommended that the valve assembly should be inspected every 12 months. Check the bent
links (5.2), and poppet (5.1) carefully to make sure that there is no permanent deformation, wear,
cracking, or any other damage. Check the bent link pins (5.3) carefully to make sure there is no
permanent deformation such as bending and cracking. Replace any deformed, worn or damaged
parts in the valve assembly. See Section "REPLACE VALVE ASSEMBLY AND PARTS" for
procedures.
Warning: Deformed bent link pins (5.3), drive link (5.6) and bent links (5.2) may cause leakage
through poppet seals. Further service will lead to cracks and breakage, which will cause a
complete failure of the API rack coupler.
Visually examine the shaft (2) every 12 months for significant dirt accumulation that could cause
shaft seal leakage. Visually examine the shaft (2), bearing washer (8), handle (10) and shoulder
screw (21) for wear and damage. Replace any worn or damaged parts.
090140 REV5 2021/12/15
877.582.3569
7