Clearwater Enviro Technologies AG-400 Manuale di installazione e funzionamento - Pagina 4
Sfoglia online o scarica il pdf Manuale di installazione e funzionamento per Controllore Clearwater Enviro Technologies AG-400. Clearwater Enviro Technologies AG-400 8. Electronic lime scale control system for agriculture applications
Basic overview
- Installation of the ScaleBlaster A
/computer on a wall near an electrical outlet and a signal cable that is wrapped around the incoming water
supply line going to the building or equipment (boiler, chiller, drinkers, Cool Cell Pads, etc.) You will need to
locate a section of straight pipe of about 18 inches, and a location to mount the control box that is near an
electrical outlet. This signal cable must be within 10 feet of the control box – no matter what.
At least 6" of straight pipe
(before and after coil)
Wrap coil tightly (See
chart for number of
wraps)
At least 6" of straight pipe
(before and after coil)
C.) Site Survey
G commercial model i
AG-150, AG-200, AG-300 or AG-400
Tie wrap
Coil leads must be no longer
than 10' (20' round trip)
Tie wrap
Vertical or
horizontal water
pipe entering
the building or
equipment
Page 4
nvolves mounting the power box
Power cable is 5 ½ ' long.
If required, use a 16 awg
extension cord of no
more than 25'
Nylon cable ties
Example of a properly wrapped pipe.
No gaps or loose wire wrappings allowed!
Power source
115VAC or
230VAC, unit
auto switches