CleaverBrooks ClearFire SFH Manuale di avvio - Pagina 5
Sfoglia online o scarica il pdf Manuale di avvio per Caldaia CleaverBrooks ClearFire SFH. CleaverBrooks ClearFire SFH 14. Horizontal steam boiler
1.5 Electrical Connections
Refer to Figure 3 and Figure 4 for CFH wiring and cable connections. See also wiring diagram on page 13.
A qualified electrician or service technician must make the electrical connections to the boiler; all local
electrical and building codes should be adhered to.
Refer to wiring diagram provided with the boiler or in the CFH manual. Ensure all required customer
connections are properly made. Main power (115 VAC single phase 60Hz) and any remote wiring should be
brought to the left side of the control panel and terminated at the appropriate terminals provided. Controls for
the boiler feed pump (or feedwater valve if applicable) should be wired to control panel terminals 6 and 7.
Customer
connections
and power
wiring
Part No. 750-293
Ignition
Transformer
Blower Power
Cable
Cable Harness
(Burner Controls)
Figure 3 Control panel cable connections
Figure 4 CFH wiring and cable connections
CB Falcon
(Panel cover removed)
Blower Signal
Cable
CFH Startup Guide
Flame Rod Cable
NOTICE
The blower signal wiring
must be isolated from the
blower power wiring and the
high voltage ignition cables.
5