djpower X-4LED Manuale d'uso - Pagina 3

Sfoglia online o scarica il pdf Manuale d'uso per Attrezzature per DJ djpower X-4LED. djpower X-4LED 8. Co2 jet (single unit)

Foreword
Thank you very much of choosing the DJPOWER X-4 LED Co Jet machine.
Before start operating,we strongly suggest to read the user manual carefully.By
following the instructions in the user manual will ensure your safety while
operating the machine,easily achieve the best effect,as well as understanding
the right way to care for and maintain the machine in order to prolong the product
life cycle.
Products description
X-4 LED CO Jet is a large unique
2
series.Every device is small and light,which has two control modes,electronic
control and DMX control.It's suitable for all large kinds of place and perform.The
bundling spraying gas column can achieve ten meters,with 27(5W LED),can
change colors freely .
Pay attention to all attentions in the user manual and warning printed
!
on the device ,and must operate In accordance with the instructions.
Attentions for install
Connecting pipe order: connect the nonrapid piecing first ,then the rapid.
Protect the rapid piecing when connecting,avoid rubbing,striking with hard
goods (like floor), keep piecing clean,or will result in the rapid piecing can't seal.
Because the pressure of pipe is very huge when the machine is working,so the
nonrapid piecing must be screw up by wrench while connecting, otherwise may
cause air leakage.
After connecting pipes, test electric property
connect CO .
2
Test electric property's method: Test every solenoid valve if has on and
off order by electronic control or DMX control,when solenoid valve on and
off ,it will make a sound.
After testing electric property, prohibit everyone close to gas column right
above,open the valve of the gas bomb slowly.Don't open all the valve quickly,
ought to listening carefully if there is any voice of leakage when you open it
.Ensure there is not air leakage,then open the valve.
If air leakage ,turn off the valve of gas bomb immediately,make sure the gas in
piecing and pipes are all let out,then connect. If air leakage is nonrapid piecing,
aways it's not screwed up.use wrench screw up can resolve. If air leakage is
rapid piecing,aways it's not connect in place.Now you can't connect again
immediately.Firstly separate the rapid piecing ,and wait for over ten minutes,
when it's in normal temperature,then connect.
After open all the valve of gas bomb ,the pressure of gauge display normally
(about 5-7Mpa),if it's too low, mean that the gas is not enough.
One second before the first spray will lesser after connect,it's an normal
gas column machine
of the
01
2
with two devices in
machine firstly,if it is fine,