ALUZ ZIBI A1 Series Manuale di istruzioni per l'installazione - Pagina 7

Sfoglia online o scarica il pdf Manuale di istruzioni per l'installazione per Apparecchiature di illuminazione ALUZ ZIBI A1 Series. ALUZ ZIBI A1 Series 12. Surface zuco pivot bios illuminated
Anche per ALUZ ZIBI A1 Series: Manuale (11 pagine), Manuale (13 pagine), Manuale (11 pagine), Manuale di istruzioni per l'installazione (11 pagine)

1
Measure area where luminaire will be installed. Use a laser line to create a
reference along installation area, ensuring accurate placement of mounting
clips. Mark location where each mounting clip will be installed along
reference line.
2
The number of required mounting clips differs for dry and wet location
products. Verify number of mounting clips is appropriate for installation
environment before beginning installation. Do not install luminaires with
inadequate number of mounting clips. Refer to the Mounting Clips page for
additional information.
3
Lay mounting clips along reference line and pre-drill surface using an
appropriate drill bit for surface and screw size.
Recommendation: 8/32 x 1" Screw.
Note: Allow 1/4" clearance for lateral expansion of assembled mounting clips.
Only install mounting clips on flat, even surfaces.
4
If applicable, connect disconnects between luminaire segments. Slide
shrink tube over connectors and apply heat. The shrink tube will shrink
down, sealing the connectors. Apply silicone around sealed connectors for a
stronger seal.
Note: Only use a heat gun to apply heat to shrink tubes. Do not use an open
flame such as a lighter or gas torch.
1170 N Red Gum St, Anaheim, CA 92806
aluz.lighting
© ALUZ All Rights Reserved. ALUZ reserves the right to make changes or withdraw specifi cations without prior notice.
A1 Series | Surface
ZIBI Standard RGBW
(A1-ZIBI-STN-RGBW)
Shrink Tube
2"
Apply Heat
866.ALUZ.LTG | 714.535.7900
5
Screw MC-1 mounting clips to surface, then snap luminaire into mounting
clips. Install set screws if required. Set screws are required for downward and
outward facing applications.
Set Screw
6
Perform a continuity test before connecting luminaire to power source.
Refer to Troubleshooting & Continuity Test page for additional information.
7
Verify wiring diagram, then connect luminaire to power source.
Page 7 of 12
Wet Location Mounting
Installation Instructions
4 / 29 / 2022 / Rev 2