ALUZ ZIBI A1 Series Manuale - Pagina 6
Sfoglia online o scarica il pdf Manuale per Apparecchiature di illuminazione ALUZ ZIBI A1 Series. ALUZ ZIBI A1 Series 11. Surface zuco pivot bios illuminated
Anche per ALUZ ZIBI A1 Series: Manuale di istruzioni per l'installazione (12 pagine), Manuale (11 pagine), Manuale (13 pagine), Manuale di istruzioni per l'installazione (11 pagine)
1
Measure area where luminaire will be installed. Use a laser line to
create a reference line along installation area, ensuring consistent
alignment of mounting clips. Mark location where each mounting
clip will be installed along reference line.
2
Mark location where mounting clips will be installed.
Note: The number of required mounting clips differs for dry and wet
location products. Verify number of mounting clips is appropriate
for installation environment before installing. Do not install
luminaires with inadequate number of mounting clips.
3
Lay mounting clips along reference line and pre-drill using an
appropriate drill bit for surface and screw size.
Recommendation: 8/32 x 1" countersink screw.
Note: Allow 1/4" clearance for lateral expansion of assembled
mounting clips. Only install mounting clips on flat, even surfaces.
4
Screw mounting clips to surface, then snap fi xtures into mounting clips.
Note: Ensure fi xture segments are aligned.
1170 N Red Gum St, Anaheim, CA 92806
aluz.lighting
© ALUZ All Rights Reserved. ALUZ reserves the right to make changes or withdraw specifi cations without prior notice.
A1 Series | Surface
ZUCO Pivot BIOS Illuminated
(A1-ZUCO-PVT-BIOS)
866.ALUZ.LTG | 714.535.7900
5
If applicable, make connections between fi xture segments using
wet location splice connectors.
a
Slide shrink tube over wires and connector.
Part wires 3/4" for insertion into the wet splice connector.
b
Push wires into connector until they stop at the center point.
Repeat process for the other side.
Note: The positive wire (+) has a ribbed wire jacket, the negative
wire (-) has a smooth wire jacket.
c
Use pliers to push splice buttons down completely until they sever
the wire and snap into place.
d
Slide shrink tube over connector and apply heat. The shrink tube
will shrink down around the connector. Apply silicone around the
ends to create a stronger seal.
Note: Do not use an open flame such as a lighter or torch to heat
shrink tube.
e
Position connection as needed. Maintain a gap of no more than
1/2" for continuous runs to retain even illumination.
6
Perform a continuity test before connecting to power source.
Refer to Continuity Test for details.
Page 6 of 11
Wet Location Mounting
3/4"
Installation Instructions
8 / 9 / 2023 / Rev 0