Alvarado UltraQ Manuale - Pagina 9
Sfoglia online o scarica il pdf Manuale per Tornelli Alvarado UltraQ. Alvarado UltraQ 16. Pedestal
Anche per Alvarado UltraQ: Manuale (16 pagine)
Battery Operations
Items Required
•
Battery key
•
Replacement battery
Checking Battery Charge Level
Press the gray charge level display button on the battery to display the current charge level of the battery. A
new, fully charged battery should be able to allow continuous pedestal operation for up to 18 hours. The
maximum time the battery can power the pedestal will decrease as the battery ages.
Copyright © 2022 Alvarado Mfg. Co., Inc.
All rights reserved.
UltraQ Pedestal Installation Guide | Version 1.0
Charge level
display button
Page 9
PUD4599