Bluerock Tools PTK-300 Manuale operativo - Pagina 15
Sfoglia online o scarica il pdf Manuale operativo per Strumenti Bluerock Tools PTK-300. Bluerock Tools PTK-300 20. Pipe threading kit for pd- 300/ptm-300
P T K - 3 0 0
P I P E
T H R E A D I N G
General Maintenance
SERVICING SHOULD ONLY BE DONE BY A QUALIFIED TECHNICIAN.
DON'T FORGET TO UNPLUG POWER TO UNIT PRIOR TO SERVICE!
Ø
Inspect electrical cords and electrical connections if using optional PD-300 power drive.
Ø
Keep machine clean and free of debris.
Ø
Check for misalignment, binding and breakage of all moving parts. If damaged, repair tool before use.
Ø
Check the cutting blade on the pipe cutting assembly.
Ø
Clean dies and inspect for chips. Also check the sharpness on the dies. If they are dull or broken, replace ALL dies
with identical set.
Ø
Clean chuck teeth with wire brush if using optional PD-300 power drive. Check the attrition of the claw points on the
3-jaw chuck. If the points are worn, replace with identical piece.
Ø
Proper lubrication is essential to trouble-free operation and long life of the optional PD-300 Power Drive. Grease
main shaft bearings every 2 to 6 months depending upon amount of Power Drive use. Grease fittings are provided
on side base, one at each end of shaft. Use a good grade of cup grease.
Ø
After each use coat all working surfaces with corrosion resistant oil.
Ø
Check brushes for wear and replace if worn if using optional PD-300 power drive.
K I T
Note
12
5
Chapter