- ページ 6
屋外用家具 Co-op ICE FISHING hutのPDF マニュアルをオンラインで閲覧またはダウンロードできます。Co-op ICE FISHING hut 14 ページ。
2
ICE FISHING HUT ASSEMBLY
STEP 1. JOIST AND BLOCKING ASSEMBLY
13
/
"
3
8
13
/
"
3
8
8¾"
• Connect the Joist Blocking (1) to the Floor Joists (2) using 3" Deck Screws.
6
NOTE:
• This Ice Fishing Hut is compact enough to fit in a 4' x 6½'
truck box with the tailgate closed. It can be constructed with
or without windows and insulation can be added to the walls,
floor, and ceiling as desired.
NOTE:
The location of the blocking may
8¾"
be adjusted to suit the desired ice
fishing hole size and location.
3" Deck Screws -12
• lt is good practice to drill clearance and pilot holes before
installing wood screws in narrow boards. Doing so makes it
easier to align and assemble the joint, creates a stronger joint,
and reduces the chance of splitting the wood.
STEP 2. FLOOR FRAME ASSEMBLY
• Connect the Rim Joists (3) to the Floor Joists (2) using 3" Deck Screws.
3" Deck Screws -16