- ページ 8

扇風機 aero pure ABF110DHL6ORのPDF 取付説明書をオンラインで閲覧またはダウンロードできます。aero pure ABF110DHL6OR 15 ページ。 Bath fan

aero pure ABF110DHL6OR 取付説明書
INSTALLATION I (NEW CONSTRUCTION) CONTINUED
1.
Bend down 8 tabs for positioning as (Fig.2.a) and
unfold the bracket assembly as (Fig.2.b).
2.
Fix one side of the bracket assembly to the joists by
drilling 2 tapping screws (ST4x20) which have been
fixed on it. (Fig.3)
3.
Adjust the length of bracket assembly as the
spacing between joists, and install to joist by drilling
the other 2 tapping screws which have been fixed
on the other side. Adjust the active part of bracket
assembly to the proper position. (Fig.3)
4.
Place the adaptor on the bracket assembly as
indicated position, and install it by using 2
self-drilling screws (ST4X30). (Fig.4)
5.
Push the fan body upwards until the fan body is
stopped by the buckle on the adapter and secure
the fan body by using the remaining 3 self-drilling
screws (ST4X30). (Fig.5)
CAUTION:
Hold the fan body to prevent falling before fixing
the screws.
8
Active part
Joist
2 Screws
(ST4X30)
Unit: inches (mm)
Screws
(ST4X20)
Fig.3
Position
of adaptor
Fig.4
Buckle
Fan body
3 Screws
(ST4x30)
Fig.5