- ページ 8

ウォーター・ディスペンサー Euro-Clear BlueSoft 1354EA-RXのPDF メカニック・マニュアルをオンラインで閲覧またはダウンロードできます。Euro-Clear BlueSoft 1354EA-RX 15 ページ。 Iron, manganese, ammonia and other natural organic matter removers, water softeners with ecomix media

Euro-Clear Kft.
Water purification and treatment equipment manufacturer and wholesale distributor
Tel: +36 96 544-240 • Fax: +36 96 544-248 • E-mail: [email protected] • Web: www. euro-clear.eu
4.3.1. WATER PRODUCTION
During water production, the water gets into the column through the upper filter and it
flows through the charge to remove iron from up to down while the divalent iron ions
get oxidized and filtrated. The iron free water gets out of the device through the lower
filter.
4.3.2. BACKWASH
During backwash the water gets into the column through the lower filter and it flows
through the charge from down to up. Meanwhile, the filtrating charge gets stirred up
and the iron residual gets removed. The water for backwash gets out into the
channel through the drain.
4.3.3. DOWNFLOW WASHING
During the downflow washing the water gets into the upper filter into the column to
store charge and it flows through the charge from up to down. It goes into the
channel through the drain.During the downflow washing the recompression of the
filtrating charge that has been stirred up is done.
4.4. DETAILED DESCRIPTION OF THE OPERATION CONTROL
The automatical blocked valve is solely time controlled during the operation and all
the other working processes. There is an electronic clock for metering time. Apart
from metering time, this clock gets the mechanisme of the blocked valve to work.
The control unit has been programmed during production, the time for backwash is 2
o'clock at night. The backwash lasts for ~20 minutes. The frequency of backwash
can be programmed between 1-99 days, depending on the system's needs.
5. INSTALLATION AND SETTING-UP OF THE DEVICE
5.1. CONDITIONS OF INSTALLATION:
A room with flat, horizontal and hard flooring is needed for the installation of the
device. The flooring and the direct surroundings of the device must resist to the
corrosive effect of the brine. The device must be installed in a room the temperature
of which is between +5°C to +40°C. The temperature of the raw water to be treated
must not exceed +30 °C. The device must not be installed in a strongly damp or
dusty room. It must be protected from frost, radiant heat and ultraviolet radiance.
Near the device, sewage connection and 230 V 50 Hz grounded, electric socket
must be provided. In order to diminish risks, we advise to install the device into a
room provided with floor drainage.
Below water pressure of 2,5 bars, proper regeneration is not guaranteed, so in this
case we advise to build in a device to increase pressure.
BlueSoft Industrial Iron and Manganese Remover
Page 8.