- ページ 9

ホットタブ American Standard EVOLUTION 7236V.068CのPDF 設置および操作マニュアルをオンラインで閲覧またはダウンロードできます。American Standard EVOLUTION 7236V.068C 14 ページ。 Air baths

American Standard EVOLUTION 7236V.068C 設置および操作マニュアル
AIR BATH ELECTRICAL INSTALLATION INSTRUCTIONS
All wiring must be performed by a licensed electrician in accordance with the national electrical code and all other applicable codes.
!
WARNING: When using electrical products, basic precautions should always be observed, including the following:
1. DANGER: RISK OF ELECTRIC SHOCK! Connect only to a circuit protected by a ground-fault circuit interrupter.
2. Permit access for servicing blower as noted.
3. All building materials and wiring should be routed away from the air blower.
PLEASE SEE THE FOLLOWING TABLE FOR GFCI CIRCUIT REQUIREMENTS:
GFCI CIRCUIT REQUIREMENTS:
The air bath should be installed on a 120 vac,
dedicated GFCI circuit.
The circuit should be hard-wired from the electrical power supply panel. The
circuit must be a three (3) wire circuit from the electrical supply panel. A
grounded neutral wire and a third wire, earth ground, are essential.
120V, 60HZ
ELECTRICAL
FEED
15A GFCI
GFCI
ELECTRONIC ACTIVATED AIR BATH (4 BUTTON PANEL)
15
20
or
amp
9
FOR MODEL NUMBERS:
2425L / V.168C-RHO
2422L / V.068C
2425L / V.268C-LHO
2645L / V.068C
2771L / V.068C
7236L / V.068C
754072-100 Rev. A