- ページ 13
ネットワーク・ハードウェア Amerisolar Wolfram-BAT-5.12のPDF インストレーション・マニュアルをオンラインで閲覧またはダウンロードできます。Amerisolar Wolfram-BAT-5.12 15 ページ。
Worldwide Energy and Manufacturing USA Co., Limited
multiple systems, up to six in parallel. In parallel, the positive and negative poles of the power
lines are connected in turn. The communication line is connected from the "Link Port 1" of the
first battery (the battery connected to the load or inverter) to the "Link Port 0" of the second
system, and the "Link Port 1" of the second system is connected to the second system. The
"Link Port 0" of the three systems, and so on, can connect up to 6 units. The panel dial switch
does not need to be dialed. See the figure below for details:
Figure 11. electrical installation diagram
Directly connect the battery of the load or inverter, draw the communication line from the CAN
communication port to the communication port of the load or inverter, and connect the
positive and negative cables to the positive and negative ports of the load or inverter
respectively.
5 Operating
5.1 Boot Up
Before powering on, make sure that the communication and positive and negative cables are
correctly connected, and there are no foreign objects around the battery. Boot steps:
•Press the system power button;
•Long press the red soft start button for 3 seconds. All panel lights flash once;
•The green running indicator flashes every 2 seconds, indicating that the system is booted
normally;
•If multiple units are used in parallel, first press all the power buttons of all batteries, and then
press and hold the red soft start button of any battery for 3 seconds, all batteries are
automatically turned on.
5.2 Shutdown
11