- ページ 5

フェンス&ゲート Ameristar TransPort IIのPDF 取扱説明書をオンラインで閲覧またはダウンロードできます。Ameristar TransPort II 8 ページ。 Ornamental cantilever gate

9.
Un-package the truck assembly hardware kits (TGKOD). Install
truck assemblies onto truck brackets as shown in Figure 7A, leav-
ing 1" of thread above bracket. Install truck assembly brackets
on gateposts facing the public side of the gate, utilizing u-bolts
provided, aligning them so that gate will hang level horizontally,
with bottom of gate no more than 4" above grade. Tighten truck
assembly brackets nuts See Figure 7B.
Figure 7A
10.
Stand the gate upright, being careful not to twist the gate or
cause the track to bend. This is most easily accomplished by
lifting the top of the gate at two or more equally divided loca-
tions (not at the ends) and leaning it against a rigid structure.
Keeping the gate upright without twisting, move the gate so
that the trailing edge is in line with the first post (closest to
the opening); then lift the end of the gate so that the upper and
lower track raceways slide onto the first set of truck assem-
blies. Raise the opposite end of the gate and continue sliding
the gate until it engages the second set of truck assemblies.
Continue to slide gate to the half-open position. Install gate
stops in the raceway of the track on the leading and trailing
edges of gate. See Figure 8.
11.
To mount the two (2) gate latches, begin by sliding the gate
to the fully closed position. Install the guides on the leading
edge of the gate, just below top track and just above bottom
track, using fasteners provided. Attach the receiver assem-
blies to the tandem receiver posts so that they are aligned
with the guides. See Figure 9.
|
888-333-3422
5
AMERISTARFENCE.COM
PART # TP-II INST | 10/2013
Figure 7B
Guide
Receiver
Figure 9
Figure 8
Patent No. D609551
5