- ページ 5

ゲートオープナー DoorHan SHAFT-30のPDF 設置および操作マニュアルをオンラインで閲覧またはダウンロードできます。DoorHan SHAFT-30 12 ページ。 Ip65/60 ip65
DoorHan SHAFT-30 にも: インストレーション・マニュアル (8 ページ), マニュアル (12 ページ)

DoorHan SHAFT-30 設置および操作マニュアル

3. OPERATOR UNIT

4. OPERATOR INSTALLATION

4.1. TOOLS

1
2
1.
Set of spanners
2.
Set of slotted and cross screwdrivers
5
6
3.
Set of drills for metal
Make sure, that the door is in good working condition and the torsion springs balance the door leaf before installation. Install
the operator as described below (see par. 4.2 or 4.3).

4.2. ON-SHAFT INSTALLATION

Install mounting bracket on the wall using
screws. The mounting bracket can be installed
from the left or from the right of the operator.
Turn the release lever 180 degrees counter-
clockwise.
Install the first closing ring on the door shaft.
Install the operator on the door shaft (make
sure, that the bushing key is in proper position)
and screw it to the mounting basis.
Install the second closing ring on the door
shaft and push it close to the operator.
Install the first closing ring close to the operator
and fix both closing rings.
1
1
3
4
5
5
4.
Set of drills for concrete
5.
Pliers
7
8
6.
Hacksaw for metal
Closing rings
135
1.
Reducer casing
2.
Output shaft
3.
Motor
1
1
2
2
2
2
4.
Hand chain components
5.
Hand chain
5
5
6
6
6
6
7
7.
Electric drill
8.
Tape measure (folding rule)
Fastening
bracket
OPERATOR UNIT
100
352,5
6.
Cable
7.
Wiring terminal block
8.
Release handle
3
3
3
4
3
4
4
9.
Limit switch
7
7
7
8
8
8
Bearing
bracket
5
4
8