- ページ 8

ラック&スタンド Air Dry Ground MountedのPDF 組立説明書をオンラインで閲覧またはダウンロードできます。Air Dry Ground Mounted 8 ページ。 Clothesline

www.airdryclotheslines.com.au
Cut off the remaining cord using wire cutter/ scissors, leaving 100mm to be tucked into the inner arm
hole. See figure 9c.
Step 10:
Final adjustments
Lower the frame to the fold down position
Horizontal checks:
Sit the spirit level on the rear spreader bar. Make sure this is level. Post adjustment may be needed.
Raising and lowering the post height can be done by lifting and packing concrete as needed.
Vertical checks:
Place the spirit level on front/ rear side of the post and also sides of the posts and make sure level.
Repeat concrete packing method for adjustments.
Once clothesline is installed and square, fill the remainder of the holes with mixed concrete.
Leave clothesline in the fold down position and allow 48-72 hours for concrete to set or as per
manufacturer's instructions.
7