- ページ 3

コントロールユニット AMES A200のPDF 仕様書をオンラインで閲覧またはダウンロードできます。AMES A200 4 ページ。 Pressure vacuum breaker

AMES A200 仕様書
Model A200
Sizes:
/
3
• Installation
• Maintenance
• Repair Kits
Installation Requirements:
1. Install 12" above highest point of downstream piping.
2. Install bonnet side up and allow for accessibility for
testing/service.
3. Install where discharge or spillage is not objectionable.
4. Do not undersize supply or oversize the valve in relation to
demand.
5. Protect from freezing.
6. ASSE Standard 1020 requires that the atmospheric vent
valve remains open until the valve body pressure exceeds
1 lb. Until this pressure is reached, some amount of
spillage will occur at the atmospheric vent. In order to
minimize this leakage on start-up close the down stream
shutoff valve and open inlet valve quickly.
"ATTN. INSTALLER: After installation,
please leave this instruction sheet for
occupant's information."
IMPORTANT: Inquire with governing
authorities for local installation
requirements.
" thru 2"
4
Installation Instructions
PRESSURE VACUUM
BREAKER
Recommended Service:
1. Test periodically as required by local jurisdictional
authorities.
2. Open test cocks to drain in cold climates if only operated
seasonally.
3. Replace rubber goods every 5 years.
Pressure - Temperature
Working Temp: 33º F-140 F
Max. Pressure: 150 PSI
Min. Pressure:
1485 TANFORAN AVE.
P.O. BOX 1387
WOODLAND, CA 95776
(916) 666-2493
FAX (916) 666-3914
15 PSI
M83-32 7/97