- ページ 3
配管製品 Akw OnyxのPDF 設置および使用上の注意をオンラインで閲覧またはダウンロードできます。Akw Onyx 4 ページ。 Low profile shower tray
Installing into solid floors or onto concrete or wooden flooring
1. Position the tray onto floor over the desired location for the shower tight
against plaster finish on the back walls in order to provide a seal. Mark around
the waste area and the tray edges on the floor. Plan the waste outlet position.
When installing the tray into solid floors.
2. Remove the tray and start to remove any tiling or vinyl flooring to expose the
concrete flooring. Cut along marked area taking care not to cut through any
pipework or any electrical wiring which may be buried below.
3. Dig out the floor area and remove any hard material to allow for the tray,
waste and outlet pipe. Remove the flooring to allow the installation of the waste
and the outlet pipe with a fall of at least 1 in 40. When using the low depth
waste, dig out approximately 60mm (2
position to allow installation. It may be necessary to remove some more
flooring material to achieve this result. Connect the waste to the outlet pipe.
4. Test the waste trap drainage and for leakages by pouring water into the
waste trap before fitting to the tray. Sand and cement should be used to raise
the tray to the finished floor height and ensure this is level. Allow this mix to set.
The tray should be bedded onto flexible adhesive, applied to the subscreed to
hold the tray firmly in position and level. Do not dot and dab. Foam should not
be used as a load bearing support as it will break down under repeated product use.
5. Lower the tray over the waste and check the waste drain position and test
that all 4 edges of the tray are level. The edges of the tray must finish flush and
level with the top of the finished floor covering.
6. Connect the waste drain to the tray using the clamping ring. See separate
waste instructions. The waste cover should now be secured in place and
protected for the rest of the installation.
When installing the tray onto concrete or wooden floors.
2. Remove the tray and start to remove any tiling or vinyl flooring to expose the
concrete or wooden flooring. The floor finish must clean, level and it must fully
support the tray on all sides.
3. Remove the floor material to allow the installation of the waste and the outlet
pipe with a fall of at least 1 in 40. Always follow separate waste installation
instructions during installation. Connect the waste to the outlet pipe.
4. Test the waste trap drainage and for leakages by pouring water into the
waste trap before fitting to the tray. The tray should be bedded onto flexible
adhesive.
5. Lower the tray over the waste and check the waste drain position and test
that all 4 edges of the tray are level.
6. Connect the waste drain to the tray using the clamping ring. See separate
waste instructions. The waste cover should now be secured in place and
protected for the rest of the installation.
The flooring should be laid up to the edge of the tray and
sealed with silicone sealant. The walls should be covered
with the waterproof wall covering and then sealed to the
Step 6
tray with silicone sealant.
Plaster
Waterproof wall covering
Wall
Silicone Sealant
") depth needed under the waste
1/2
Concrete floor
Waste
Screed flooring
Step 1
Step 2
Step 3
Step 4
Step 5
Technical Help line
01905 560219