- ページ 12
水ポンプ Akw P12のPDF インストレーション・マニュアルをオンラインで閲覧またはダウンロードできます。Akw P12 16 ページ。 Shower waste pump
Commissioning Checks
as a general precaution and check before installation, always ensure the supply pipework to the
shower has been fully purged with at least 20 litres (2 buckets) of water through it before the flow
switch is installed. any building debris in the water supply will adversely affect the switch function
and may also damage the shower heater/mixer.
Install pump according to these instructions.
failure to do so may void warranty
brush out all dust, grit and debris
from shower tray
Thoroughly clean out waste
Confirm shower water supply pipework is flushed
before connecting to the shower switch via the filter
Refer to Controller Manual for Controller
Commissioning
12
General: 01905 823 298
|
www.akw-ltd.co.uk