- ページ 9

シャワーキャビン Akw Level BestのPDF 設置および使用上の注意をオンラインで閲覧またはダウンロードできます。Akw Level Best 16 ページ。 Deflector screen

Deflector Screen Instructions
Technical Help line
01905 560219
www.akw-ltd.co.uk
Step 3
Install Fixed Panel

Installation

When the panel is aligned into wall profile and on the footplate post block, drill through the
slot holes at its longest position and hold the panel in place with the 4x10mm screws.
Note: Only secure the secondary fixing holes in the final installation steps.
1
2
3
Measure the panel width
Do not drill the secondary
Align the panel and screw
and drill through adjusting
holes just yet, these are for
through adjusting slot
slot hole at its longest
final securing.
holes to temporarily hold
position.
door in place.
9
© 2016 AKW
15-010-048-01