TYPE
Manual
SUBJECT
CB15S – Technical Specifications, Setup and Operation Manual
6. Replace the top plate and sleeves.
3. Cooling Block Set up
3.1 Quick overview
The Cooling Block is integral to the ColdBlock digesters proper operation however it is not essential
and can be operated without the chiller. It is important to note that if the chiller is not used
adjustments to the method will be required.
The Unit will arrive with the Cooling Block packed separately. Cooling Block removal is required to
access lamps for maintenance, set up, or cleaning of any spills.
3.2 Setting up the Cooling Block
Cooling Block Installation Steps:
WARNING: Turn off chiller before disconnecting coolant hosing. When disconnecting pay special
attention to spills.
NOTE: Please heed the general safety procedures outlined in this document such as: allow
adequate cooldown for rest of unit and disconnect power before any set up or break down of unit.
Use good lifting practices when lifting and moving the Cooling Block.
CB15S – Technical Specifications, Setup and Operation Manual
CBTI-MAN-001
Rev: 0
Page 5
Date Issued: 2019-11-13