- ページ 7
ヒーター Douglas BF 10-LPGのPDF インストレーション&ユーザーマニュアルをオンラインで閲覧またはダウンロードできます。Douglas BF 10-LPG 20 ページ。
DOUGLAS & Co. BF 10H-NG BF 10>LPG HEATER UNITS
INSTALLATION USER INSTRUCTION MANUAL
Page 7 of 20
5.
Installation of flue systems : (Continued)
The BF 10 H Heater Body (Wall box) may be separated from the Heater for attachment to
the Wall or escutcheon, and alignment of the Flue System. This is not a part of the flue system
however it is referred to in flue installation at this
point. The front panel removes from the Heater
Body for set up of the Inner Flue Duct and Elbow through the Wall box, after positioning is checked
and mounting points are determined.
BF 10 H Heater before removal of front cover & internals. Case referred to as Wall box.
All dimensions are in mm.
UNIT OVERALL DIMENSIONS :
The screws are removed from the bottom of the Heater box and
bottom plate is slid out. Gas burner module, water section with
heat exchanger all slide out in one. This allows the Wall box to
be positioned without any weight on the Outer Air Duct. The Wali
box
mounting points should
be determined and
brackets
positioned into studs or escutcheon support. The Heater should
not be self supporting of the Outer Air Duct alone.
BF 10 H Heater after removal of front cover.
BF
10
H
a
'15
:
/●
●
itfi!
Heater showing face of Wall box
which is fitted to Wall.
Note the screw holes for connection of Outer Air Duct and
tabs for securing Inner Flue Elbow. Heater Internals
are
removed.
This face is against Wall and bracketed to mounting
points before Heater Internals are replaced
When the connections are made to the Outer Air
Duct, the Wall box is completely mounted and
bracketed.
The Heater Internals should now be refitted and
bottom plate slid into place in preparation for the
fitting and alignment of the Inner Flue & Elbow Assembly.