- ページ 6

サーキットブレーカー Amphenol Telect nrg600BT08-MのPDF インストレーション・マニュアルをオンラインで閲覧またはダウンロードできます。Amphenol Telect nrg600BT08-M 20 ページ。 600a load center with nrgsmart remote monitoring

Amphenol Telect nrg600BT08-M インストレーション・マニュアル

Important Installation Guidelines:

Elevated Operating Ambient Temperature :: If you install the
rack in a closed or multi-unit rack assembly, the operating ambient
temperature of the rack environment may be greater than room
ambient. Therefore, take care to install the equipment in an
environment compatible with the maximum operating temperature.
Reduced Air Flow :: Installation of the equipment in a rack should
be such that the amount of air flow required for safe operation of the
equipment is not compromised.
Mechanical Loading :: Mounting of the equipment in the rack
should be such that a hazardous condition is not achieved due to
uneven mechanical loading.
Circuit Overloading - Give consideration to the connection of the
equipment to the supply circuit and the effect that overloading of the
circuits might have on overcurrent protection and supply wiring. Use
appropriate consideration for equipment nameplate ratings when
addressing this concern.
Reliable Earthing :: Maintain reliable earthing of rack-mounted
equipment. Pay particular attention to supply connections other than
direct connections to the branch circuit (e.g., use of power strips).
Disconnect Device :: Incorporate a readily accessible disconnect
device in the building installation wiring.
Inspection
Please read and understand all instructions before starting installation.
If you have questions, contact Amphenol Network Solutions Technical
Support at
When you receive the equipment, carefully unpack it and compare it to
the packaging list. Please report any defective or missing parts to
Amphenol Network Solutions at
509.926.6000.
Amphenol Network Solutions is not liable for transit damaged. If the
product is damaged, please report it to the carrier and contact Amphenol
Network Solutions Quality.
NOTE: The nrg600BT08-M is suitable for installation as part of
a Common Bonding Network (CBN) for installation in Network
Telecommunication Facilities an OSP.
nrg600BT08-M
or call 509.926.6000.
or call
Installation
ALERT! It is recommended that this product is installed within a restricted
access location where access is through the use of a tool, lock and key, or
other means of security and is controlled by the authority responsible for
the location. This product must be installed and maintained only by
qualified technicians.
Verify all connections meet requirements specified in local electric codes
or operating company guidelines before supplying power. Unit shall be
protected by a listed circuit breaker or branch-rated fuse sufficient to
interrupt power levels specified on the preceding page.

Rack Mounting

The nrg600BT08-M panel can be mounted in 19-in. & 23-in. EIA and
WECO racks.
The nrg600BT08-M panel can be flush-mounted, 2-in extended or
4-in extended.
1.
Use the 12 screws provided to fasten the brackets to the panel.
2.
Locate an unused rack position and mount panel using at least four
sets of fasteners (screws, flat washers and star washers provided) per
side. It's best to mount the panel as high as possible on the rack.
3.
Tighten screws to 35 in.-lb (4.29 N•m). Amphenol Network
Solutions recommends using a seismic rack for best rigidity. Also,
if you intend on installing more than one panel per rack, you need
to plan a rack arrangement that dissipates heat efficiently.
4.
Loosen (you need not remove) four screws securing transparent
terminal cover to the rear of the panel.
5.
Remove the cover.
6
All rights reserved. 12.05.19 145121-2 A0
Amphenol Network Solutions
509.926.6000 – amphenol-ns.com