- ページ 2

アンプ COMBA BDA NGのPDF インストレーション・マニュアルをオンラインで閲覧またはダウンロードできます。COMBA BDA NG 8 ページ。

COMBA BDA NG インストレーション・マニュアル
1

INSTALLATION

1.1

BDA NG WALL MOUNTING

Remove the mounting bracket from the BDA.
Drill four holes on the wall/plywood using the position of four holes on the mounting rack as a guide.
Install the Mounting Rack to the wall.
Hang the equipment and secure the enclosure to the mounting rack.
1.2

BBU NG WALL MOUNTING

Drill four holes on the wall/plywood using the position of holes from battery backup unit as a guide.
Install the battery backup unit (without battery) to the wall.
Figure 1: BDA NG Wall Mounting
Figure 2: BBU NG Wall Mounting