- ページ 5

製氷機 Follett Horizon Elite Chewblet HCD1010RMSのPDF 取付説明書をオンラインで閲覧またはダウンロードできます。Follett Horizon Elite Chewblet HCD1010RMS 17 ページ。 Ice machine with ride technology installation instructions for ice manager diverter valve
Follett Horizon Elite Chewblet HCD1010RMS にも: マニュアル (8 ページ), マニュアル (8 ページ), 取付説明書 (16 ページ)

Follett Horizon Elite Chewblet HCD1010RMS 取付説明書

Prepare the installation site.

Provide drainage, water supply and electrical power to within 6 feet (2m) of ice
machine in accordance with local and national codes. Outdoor installation is
not recommended and will void warranty.
2.1
2.1
Installation site requirements
2 ft. x 1" OD
silicone tubing
Electrical
• 120/60/1-5 amps
Potable water supply
• 10–70 psi (69–483 kpa)
• 45–90 F (7–32 C)
• Follett recommends the use of an in-line water filtration system (item# 00130286)
• This equipment is to be installed with adequate backflow protection to comply with applicable
federal, state, and local codes
Drains:
3/4" Barb for silicone drain, 3/8" push-to-connect for chassis drain
• Minimum 8" radius on silicone drain line. Drain line from the ice machine must have at least
1/4" per foot pitch (6,4 mm/0,3 m).
Refrigeration lines
• 5/8" ∅ (15,8 mm) diameter suction line (insulated)
• 3/8" ∅ (9,5 mm) liquid line
ICE MANAGER
3/4" barb x 3/4" FPT
3/4" MPT x 1" slip
1" PVC Drain
(3/8" push-in connection, 3/8" OD tubing required)
remote condensing

Site preparation

3/8"
chassis
drain must
be used
1/4" per foot
(6,4 mm per 0,3 m)
2
NEMA
5-15
3/8" ∅ (9,5mm)
5/8" ∅ (15,8mm)
1'
5