- ページ 10

防火・防煙ダンパー Advanced Air 0160 SeriesのPDF クイック・スタート・マニュアルをオンラインで閲覧またはダウンロードできます。Advanced Air 0160 Series 14 ページ。 Air control fire damper
Advanced Air 0160 Series にも: インストレーション、オペレーション、メンテナンスマニュアル (13 ページ)

Advanced Air 0160 Series クイック・スタート・マニュアル
PATENT APPLIED FOR
AFS Blockwork Installation -
2 Hour - E120
(P
ATENT
Maintenance Procedure

These dampers are installed as a life-safe product and will require regular physical and visual examinations. It is essential
that that the assembly is kept in a clean, dust free condition at all times.

It is essential that an access door has been provided in the adjacent ductwork to facilitate the inspection and maintenance.

Ensure that no physical restriction of the blades has occurred during the installation process.

Remove any dirt or debris built up in the damper, apply a little WD lubricant or light oil, any excessive oils should be wiped
away.

Check the operation of any ancillary products that may be fitted.

Examine the fusible link to ensure that no corrosion has occurred and that the plates are free from distortion and are in good
condition to operate when required.

Close the blade pack by manual operation and examine the blades to ensure;

They are in the fully closed position and have located in the ramps.

They are all position in the frame correctly i.e. square to the frame.

They are all in a clean condition.

The period between maintenance checks can best be ascertained by system conditions or as directed by local regulations for
ventilation plant and ancillaries, but should not exceed a maximum interval in excess of twelve months.

The report should be completed following the Maintenance Procedure included within this document.
Due to continuous product development Advanced Air (U.K.) Ltd
reserves the right to change any information without prior notice.
Burrell Way,
Thetford, Norfolk,
IP24 3QU, England
Tel: +44 (0) 1842 753624
Fax: +44 (0) 1842 762032
P
)
ENDING
0160 Series
Curtain Fire Dampers
Installation & Maintenance Instructions
Pre Installation Notes
1. Ensure that the damper is kept in a clean dry
environment and that there is no damage to the damper.
2. Remove all packaging and transit ties before installation.
Installation Procedure
1. Vertical builders work barrier to have an appropriately
sized lintel and opening clearance for the fire damper and
Firebatt.
2. The opening in the wall must be cleaned, free of dust and
any other contaminants which could impair the acrylic
sealant. A clearance gap of 25mm (min) - 100mm (max)
gap for the Firebatt must be maintained around the fire
damper (barrier contractor).
3. The damper shall be mounted so that the supported side
of the damper is flush with the wall opening. It shall be
hung by M10 drop rods using the slotted rail and bolted
tight to steel anchors in the slab or soffit above.
4. The gap between the damper and the wall opening will
need filing in with 3 layers of 140kg/m3 50mm Firebatt cut
to interference fit and pushed in place.
5. All joints and gaps shall be sealed using intumescent
Acrylic Sealant.
6. The ductwork connecting to the damper spigots must
overlap by 40mm, leaving a 10mm clearance for any duct
expansion in a fire situation.
7. All ductwork connections must be sealed with an
approved ductwork sealer, and fixed with low resistance
fixings such as: aluminium alloy rivets or nylon bolts.
8. All connecting ductwork must be independently supported
within 1meter of the connections.
9. An Access cover should be fitted on the appropriate side
of the barrier to enable inspections and maintenance
work.
Date
Issue
13/01/15
Rev 4
Spec. No.
Page No.
10
CE –FD Sub