- ページ 12

防火・防煙ダンパー Advanced Air 2530のPDF インストレーション、オペレーション、メンテナンスマニュアルをオンラインで閲覧またはダウンロードできます。Advanced Air 2530 16 ページ。 Air control fire & smoke damper

Advanced Air 2530 インストレーション、オペレーション、メンテナンスマニュアル
FIRE & SMOKE – 2530 HEVAC FOR RIGID SUPPORTING CONSTRUCTION (FLOOR)
HEVAC frame
fire & smoke damper
2530 W/HEVAC
PRODUCT
BRE 287810C
CLASSIFICATION REPORT NO.
TESTED INSTALLATION METHOD SHOWN. DIFFERING INSTALLATION METHODS TO THIS MUST BE APPROVED BY THE BUILDING CONTROL AUTHORITY (BCA) BEFORE PROCEEDING.
Turnback ties
2530 Series
Fire batt
Rigid construction
APPLICATION
CLASSIFICATION
Preparing the opening
1
Ensure that the damper is kept
in a clean dry environment and
that there is no damage to the
damper.
2
Remove all the packaging and
transit ties before installation.
3
Work out the opening size to be
cut using the table adjacent.
Installation sequence
4
In the opening, mark the positions for the turnback tabs on the HEVAC frame, making sure that the
HEVAC casing will sit flush with the floor surface..
5
Create 20mm deep pockets for the HEVAC tabs to be located in.
6
Offer up the damper into the opening from below or clamp angles spanning the opening.
7
Bend the HEVAC tabs so that they lock into the pockets.
8
Fire batt of a minimum 25mm thickness and a density of 140kg/m² shall be installed under the damper
frame to serve as shuttering to facilitate installation of the penetration seal all around the damper.
9
A 4:1 mortar mix can then be gradually applied between the wall and the damper, ensuring the mortar
is only filled up to the HEVAC frame and not the damper spigots. This ensures the damper can move
within the HEVAC frame.
10
The fire batt shall remain in situ after the mortar has been applied.
11
The galvanised mild steel ductwork connecting to the damper spigots must overlap by up to 40mm,
leaving minimum 10mm clearance for any duct expansion in a fire situation.
12
The galvanised mild steel ductwork connections must be sealed with an approved galvanised mild
steel ductwork sealer and fixed with low resistance fixings such as aluminium rivets that will melt at
high temperature allowing the duct to break away without affecting the integrity of the installation.
13
The connecting galvanised mild steel ductwork must be independently supported within one metre of
the connections and have been installed in accordance with DW144.
14
An access door should be fitted on the access side of the damper for inspection and maintenance.
15
When the damper installation has been completed, checks should be made to ensure the damper is
secure and there is no movement, operation of the damper should be checked.
16
Complete DW145 Fire Damper Certificate.
RIGID CONSTRUCTION (FLOOR)
E120 (HO I  O) S
Opening width /
Opening width /
Nom. duct
height min.
200 x 200mm
Nom. duct +170mm
Nom. duct +200mm
and above
199 x 199mm
370 x 370mm
400 x 400mm
and below
Opening width /
Opening width /
Circular duct
height min.
175mm and over
Nom. duct +195mm
Nom. duct +225mm
174mm and under
395mm
height max.
height max.
425mm
12