- ページ 17

エアコン Daikin 5MXS48TVJUのPDF インストレーション・マニュアルをオンラインで閲覧またはダウンロードできます。Daikin 5MXS48TVJU 20 ページ。 R410a split series

Daikin 5MXS48TVJU インストレーション・マニュアル

Pump Down Operation

In order to protect the environment, be sure to pump down when relocating or disposing of the unit.
1) Remove the valve caps from liquid stop valve and gas stop valve.
2) Carry out forced cooling operation.
3) After 1 to 2 minutes, close the liquid stop valve with a hexagonal
wrench.
4) After 3 to 4 minutes, close the gas stop valve and stop forced
cooling operation.
5) Attach the valve cap once procedures are complete.
Forced cooling operation
1) Turn off the power.
2) Remove the right side plate (6 screws) and the shield cover (2 screws).
3) Remove the service PC-board switch cover (1 screw).
4) Switch SW5 and SW6 to off.
5) Turn the operation mode switch (SW2) to COOL.
6) Screw the service PC-board switch cover back on (1 screw).
7) Attach the shield cover (2 screws) and the right side plate (6 screws).
8) Turn on the power.
9) Push the forced operation switch (SW1) above the service PC-board cover. (The operation will start.)
• Forced cooling operation will stop automatically after about 8 minutes.
To stop the operation, push the forced operation switch (SW1) again.
Forced operation switch (SW1)
WARNING
Do not remove the switch cover unless the power has been turned off. (Risk of electric shock)
English
Service PC-board
Remove
the switch
E
D
cover
2
4
C
1
COOL
3
B
Screw
2
A
1
COOL
Close
Gas stop valve
•Switch SW5 and SW6 to off.
ON
OFF
2
1
ON
OFF
4
E
3
D
C
B
A
2
2
1
1
4
3
2
1
HEAT
Operation mode switch (SW2)
•Set to COOL.
COOL
HEAT
Hexagonal
wrench
Liquid stop
valve
Valve caps
SW6
SW5
16