- ページ 19

冷蔵庫 Electrolux #のPDF サービスマニュアルをオンラインで閲覧またはダウンロードできます。Electrolux # 49 ページ。 Over the range microwave oven
Electrolux # にも: 取付説明書 (8 ページ), 取扱説明書 (20 ページ), 取扱説明書 (36 ページ), 取扱説明書 (24 ページ), 取扱説明書 (38 ページ), レシピブック (17 ページ), 取扱説明書 (12 ページ), 取扱説明書 (20 ページ), 取扱説明書 (16 ページ), 取扱説明書 (12 ページ), 吸引マニュアル (16 ページ), ユーザーマニュアル (11 ページ), 取扱説明書 (26 ページ), 取扱説明書 (38 ページ), オーナーズマニュアル (9 ページ), 取扱説明書 (16 ページ), 取扱説明書 (16 ページ), 取付説明書 (21 ページ), オーナーズマニュアル (16 ページ), 取扱説明書 (16 ページ)

Electrolux # サービスマニュアル
PROCEDURE
LETTER
H
MONITOR SWITCH TEST
. Disconnect the power supply cord, and then remove outer case.
2. Open the door and block it open.
3. Discharge high voltage capacitor.
4. Before performing this test, make sure that the secondary interlock switch and the primary interlock
relay are operating properly, according to the above Switch Test Procedure. Disconnect the wire
lead from the monitor switch (COM) terminal. Check the monitor switch operation by using the
ohmmeter as follows. When the door is open, the meter should indicate a closed circuit. When the
monitor switch actuator is pushed by a screw driver through the lower latch hole on the front plate
of the oven cavity with the door opened (in this condition the plunger of the monitor switch is pushed
in), the meter should indicate an open circuit. If improper operation is indicated, the switch may
be defective. After testing the monitor switch, reconnect the wire lead to the monitor switch (COM)
terminal and check the continuity of the monitor circuit.
5. Reconnect all leads removed from components during testing.
6. Reinstall the outer case (cabinet).
7. Reconnect the power supply cord after the outer case is installed.
8. Run the oven and check all functions.
of the oven cavity with the door opened (in this condition the plunger of the monitor switch is pushed
in), the meter should indicate an open circuit. If improper operation is indicated, the switch may
be defective. After testing the monitor switch, reconnect the wire lead to the monitor switch (COM)
terminal and check the continuity of the monitor circuit.
5. Reconnect all leads removed from components during testing.
6. Reinstall the outer case (cabinet).
7. Reconnect the power supply cord after the outer case is installed.
8. Run the oven and check all functions.
TEST PROCEDURES
COMPONENT TEST
Black
White /White
Screw Driver
Primary
Monitor
Interlock
Switch
Switch
9
Ohmmeter
GLMV169GSB
GLMV169GBB
GLMV169GQB
PLMVZ169GCB/C