- ページ 6
炉 Drawell DW-KDN-20DのPDF 取扱説明書をオンラインで閲覧またはダウンロードできます。Drawell DW-KDN-20D 11 ページ。 Digestion furnace
Method of connection of digester furnace
Extraction tee A side with A rubber hose connection with faucet, B side with A rubber hose
connected to the exhaust gas absorption nozzle, C termination rubber hose into the sewer, B end
connection rubber hose shoulds not be too long, digest sewage water flow should be properly (3-4
l/min), to ensure that the suction tee suction, exhaust gas and water together in the sewage (besides
the icon on the mating method is adopted, my company is also equipped with A high matches
connection method: adopt vacuum pumps, filters, and exhaust gas absorption equipment through
rubber hose connection. The filter contains 500-1000ml of lye, which is neutralized by harmful
gases such as SO2, which can be used to filter the harmful substances of adsorption particle
Note: The above is a description of the connection diagram of the faucet, the pumping tee,
and the exhaust pipe of the exhaust gas absorption bottle. The actual connection is divided into 3
pipes(This device requires a total of 3 taps)The pipelines 1 and 2 are respectively a faucet and a
pumping tee, and then connected with two exhaust gas absorption bottles by a Y-type three-way
connection; the pipeline 3 is a faucet, a pumping tee, and an exhaust gas absorption bottle directly
connected all the way. This is a simple device, and the exhaust gas absorption effect is not optimal.
It is recommended to use it in a fume hood. This method works best.
4