- ページ 4

コントローラー AirStage UTY-DTGYのPDF インストレーション・マニュアルをオンラインで閲覧またはダウンロードできます。AirStage UTY-DTGY 7 ページ。 Touch panel controller

51 11

Installation preparations

Make ready the touch panel controller.
Side view
(1)
Remove the
 screw at 2 places at the top of both sides of the
touch panel controller. (Fig. 1)
(2)
Separate the front cover part and the rear cover part.
(3)
Hook your finger at the notched part indicated by arrow
the rear cover and open in the direction of arrow  . (Fig. 1)
(4)
Connect the front cover and rear cover and grasp and pull out the
connector of the  connection cable. (Fig. 1)
Fig1
1
Screw
Front cover
*
During work, be amply
careful so that the front
cover does not fall off.
(5)
Remove the installation plate
the inside of the rear cover. (Fig. 2)
Fig1
2
Fixing screw
Wiring
hole cover
*
The fixing screws are used at installation. Do not lose
them.
(6)
Installation plate dimensional drawing
Separate the installation plate from the rear cover. (Fig. 3)
Remove the screw at 2 places of the  wiring hole and remove
the wiring hole cover. (Fig. 2)
En-3
Front view
Side view
Rear cover
Connection cable harness
 fixing screws at 2 places from
Rear cover (Inside)
Fixing screw
Wiring
hole cover
Fig1
3
 and
Fig1
4
9(11/32)
Screw
*
Refer to the dimensional drawing and verify the consistency of
the hole positions of the installation screws of the switch box to be
installed in advance. (Fig. 4)
51 21

Terminal names

Terminal names: Names of connection terminals inside the rear
cover
Power supply cable
through hole
Power supply
cable connection
terminal
Rear cover outline
123 (4-27/32)
95 (3-3/4)
95 (3-3/4)
72 (2-27/32) 72 (2-27/32)
46 (1-13/16) 46 (1-13/16)
211 (8-5/16)
Installation plate
9(11/32)
Unit: mm (in.)
Anchorposition
Transmission cable
connection terminals
[TM201]
Transmission cable
through hole
CN411
CN412