Function Codes are built in set up options within Airstage IU and OU's.
Many IDU function codes may be left in their default settings; used at the discretion of the
Installer, architect or engineer. However, function codes for each IDU vary and must be checked.
Please refer to the IDU and Remote Installation Manual for complete function code details.
In order to have the Fujitsu factory Extended Warranty of (10) years
for both parts and compressor, an approved "Commissioning" must
be performed within (120) days of start up.
Please refer to the "Commissioning Report" included with the J-II ODU. You may also download
the Commissioning Report at
www.portal.fujitsugeneral.com
time users)
The Commissioning Report requires use of "Service Tool" and operation of the J-II system for (1)
hour in either HEAT or COOL mode of operation.
Collection of operating data for Commissioning must b with the system completely installed,
operational and error free.
See QIG Step 24a for a Commissioning Report example and support contacts.
THANK YOU FOR PUIRCHASING A FUJITSU J-II INVERTER SYSTEM!
23
6b
24
(Account set up required for first
ARUL18TLAV- Function code example to change ESP (External Static
Pressure) setting from 31 (.10" w.g. default) to option value 09 for .36" w.g.
For assistance completing the J-II "Commissioning Report", please contact
Fujitsu General America at (973) 575-0380 and follow the voice menu for
"Commissioning"
When complete, please email the Commissioning Report to: