- ページ 15

ウォーターヒーター Drazice OKCE 250 S/3-6 kWのPDF ユーザーマニュアルをオンラインで閲覧またはダウンロードできます。Drazice OKCE 250 S/3-6 kW 15 ページ。

Drazice OKCE 250 S/3-6 kW ユーザーマニュアル

15. ASSEMBLY GUIDE FOR ZIP-FASTENER INSULATION

(Only concerns heaters with the capacity of 750 and 1,000 litres)
Two people are enough to implement the insulation assembly; three people are required for larger boilers; the assembly
o
must be implemented in areas with the temperature of at least 18
C.
If the insulation includes tank bottom insulation, the latter must be mounted first. The insulation is then inserted around
the boiler (heater), respecting the pre-pressed insulation openings. Pull gently in the direction of the arrows to put the two
zip insulation sides together (see Fig. 6) so that the insulation does not draw down and the openings in the insulation fit
the boiler inputs and outputs. It must be secured that, before closing, both halves of the zip-fastener are not further than 20
mm apart (see Fig.7). No foam must get into the zip-fastener on closing.
After the insulation coat is properly mounted and the zip-fastener closed, insert the top lid made of foam material and
cover it with either a foil cover or a plastic lid. It is also possible to glue the outlet caps to connection places (see fig. 8).
The insulation must be stored in dry areas only.
We take no responsibility for damages caused by not respecting this guide.
Fig. 6
Fig. 7
Fig. 8
2-2014
15