- ページ 7

ボイラー Drazice OKC 125 NTRのPDF 操作および設置マニュアルをオンラインで閲覧またはダウンロードできます。Drazice OKC 125 NTR 12 ページ。 Tank-type water heaters for vertical mounting
Drazice OKC 125 NTR にも: 操作および設置マニュアル (17 ページ), 操作および設置マニュアル (20 ページ), 操作および設置マニュアル (20 ページ), 操作および設置マニュアル (18 ページ), 操作および設置マニュアル (20 ページ), 操作および設置マニュアル (18 ページ)

Drazice OKC 125 NTR 操作および設置マニュアル
anode. When draining water from the heater, the combination faucet valve for hot water must be open, preventing
occurrence of under-pressure in the heater tank which would stop the water from draining.
12.

IMPORTANT NOTICES

Without a confirmation of performed electrical installation issued by an authorised company, the
warranty certificate shall be void.
Check and exchange the Mg anode regularly.
You have to apply for approval of a local power supplier to connect the heater.
No stop valves can be put between the heater and the safety valve.
If the overpressure in the water main exceeds 0.6 MPa, a pressure control valve must be mounted before the
safety valve.
All hot water outputs must have a combination faucet.
Before filling the heater with water for the first time, it is recommended to fasten the flange connection nuts of
the tank.
It is not allowed to handle the thermostat, aside from temperature resetting with a control button.
All electric installation handling, adjustment and replacement of the regulation elements shall only be
performed by an authorised service company.
The thermal fuse must not be turned off! In case of thermostat defect, the thermal fuse interrupts electric
power input to the heating element if the water temperature in the heater exceeds 90 °C.
As an exception, the thermal fuse may also switch off due to water overheating caused by overheating the hot
water heating system boiler (in case of a combined heater).
We recommend you operate the heater with one type of energy.
Disposal of packaging material and functionless product
A service fee for providing return and recovery of packaging material has been paid
for the packaging in which the water heater was delivered.
The service fee was paid pursuant to Act No. 477/2001 Coll., as amended, at EKO-
KOM a.s. The client number of the company is F06020274. Take the water boiler
packages to a waste disposal place determined by the town. When the operation
terminates, disassemble and transport the discarded and unserviceable heater to a
waste recycling centre (collecting yard), or contact the manufacturer.
13.

FIRE-FIGHTING REGULATIONS FOR INSTALLATION AND USE OF HEATER

We would like to emphasise that the heater must not be connected to power supply if work
involving flammable liquids (petrol, spot remover) or gases, etc., is performed nearby.
14.

INSTALLATION REGULATIONS

Regulations and instructions that must be obeyed if the heater is connected
a) to the heating system
ČSN 06 0310 – Thermal systems in buildings – Designing and Installation
ČSN 06 0830 – Thermal systems in buildings – Protecting devices
b) for electric network
ČSN 33 2180 - Connecting of electric devices and appliances
ČSN 33 2000-4-41 - Low voltage electric installations Protective measures to ensure safety
ČSN 33 2000-7-701 - Low voltage electric installations: Single-purpose devices and devices in special
c) to the hot water heating system
ČSN 06 0320 - Thermal systems in buildings - Hot water preparation – Design and Project Engineering
ČSN 06 0830 – Thermal systems in buildings – Protecting devices
- Protection against electric shock
premises
- Premises with tub or shower
7