- ページ 8
池のポンプ Commodity Axis ViaAqua EF-3000 UVCのPDF マニュアルをオンラインで閲覧またはダウンロードできます。Commodity Axis ViaAqua EF-3000 UVC 16 ページ。 Pressure pond filter
Commodity Axis ViaAqua EF-3000 UVC にも: 取扱説明書 (8 ページ)
INSTALLATION SETUP
PRE-OPERATION PRECAUTION
• Verify that the O-ring is properly installed.
• Double check that all tubing is secured with a
hose clamp. Make sure there are no kinks in
the tubing.
• If using a unit with a UVC sterilizer, install
the PL compact UVC bulb according to the
directions.
• Ensure the lid is secured properly.
• Ensure the flow control knob arrow is pointing
toward the output port.
• Place the cap of the ackwash/drain
discharge port back on.
TYPICAL OPERATION
For proper filtration, operate
the pressure pond filter 24
hours a day, year round.
1. S tart the ViaAqua
pump.
2. V erify that all seals and
connections are not leaking.
pond
®
6
O-Ring
Point knob to
the output port