ラック&スタンド 1UP USA RACK STASHのPDF マニュアルをオンラインで閲覧またはダウンロードできます。1UP USA RACK STASH 2 ページ。 Rs add-on holder

In the Box:
RS Add-On Holder
Installation Hardware
Add-On Mounting Bolts
Installation
Begin by finding wall location to install. Unit requires two studs for horizontal
mounting and one stud for vertical mounting. 20" minimum clearance required
beyond both ends of unit.
Use level and tape to mark and drill 1/4" pilot holes in wall for mounting. Horizontal
mounting will require four holes. Vertical mounting will require two holes.
Use supplied lags and washers to install unit. 2" lags used for horizontal mounting.
4 1/2" lags used for vertical mounting. Spacers used for vertical mounting. Lags
should be tightened firmly.
Vertical Mounting
RS Add-On Holder
Tools Required:
Drill
1/4" Drill Bit
1/2" Socket and Ratchet
Tape Measure
Level
3/8" Allen Wrench
Spacers to install on backside
of RS Add-On Holder.
Horizontal Mounting