インバーター 2 Save Energy Owl Intuition-PVのPDF はじめにをオンラインで閲覧またはダウンロードできます。2 Save Energy Owl Intuition-PV 12 ページ。 Electricity consumption & solar pv generation monitoring - single phase, for homes fitted with solar pv

familiar site using your web browser.
b.
Check Ethernet cable connections - remove cable and refit a few
times at both ends to remove any dust on the connections.
c.
Try rebooting your broadband router by powering down for 10
seconds and then power back up. Allow 5 minutes for everything to
re-establish itself.
IMPORTANT Note for business users:
If you wish to use a Network OWL connected to a business / commercial
LAN then please note that it is usual for the internal IT Security
Department to restrict which Internet ports are open for use.
You will need to ensure that ports numbered 5004 and 5222 are opened
outbound. Without this the Network OWL will not be able to connect to
the OWL servers and your Intuition system will not function.
STEP SIX - Install Transmitter and attach Sensors
Domestic
Loads
Fuse Box /
Consumer Unit
Ring Mains,
Lights,
Cooker etc
Live
(Brown or Red
normally covered
with Grey sheath)
Important: A standard OWL Intuition-pv is only suitable for Type 1 Solar PV
installations where both the PV inverter feed and grid meter feed are con-
nected in a junction box (normally with a Henley Block) before connection to
the consumer unit (fuse box).
Locate the supply cables between the Henley Block and consumer unit
(fuse box). Using the latch, clamp the first Sensor around the insulated
Live cable going into the consumer unit. Plug this Sensor into the Trans-
© 2 Save Energy Limited 2012
Solar PV
Array
Grid-tie
Inverter
240V AC
50Hz
WARNING
- RISK OF ELECTRICAL SHOCK
- Please Refer to User Manual.
Consumption
Sensor
Henley Junction Block
Type 1 - Intuition-pv
Transmitter
DC
WARNING
- RISK OF ELECTRICAL SHOCK
- Please Refer to User Manual.
PV Generation
Sensor
Utility
Meter
Electricity
Grid