計測機器 2B Technologies 306のPDF スタートアップ手順をオンラインで閲覧またはダウンロードできます。2B Technologies 306 4 ページ。

2B
Technologies
Model 306 Start Up Instructions
Before using the Model 306 in your application, please perform the following steps to establish the
baseline performance of the instrument. By following this procedure when the instrument is first
received, the user will be able to verify that the instrument has been setup correctly and, in the
future, will be able to determine if there is any loss in instrument performance after prolonged
periods of usage.
1. Connect Power Source. Use either the supplied 12 VDC power supply or a 12V battery.
2. Power ON the instrument. "Warming Up" is displayed in LCD. The amount of time the warm
up time takes is dependent on ambient temperature. Please allow the instrument to warm
up fully before operation. LCD will display "Temperature Set" when ready.
3. Connect to outlet. Locate the stainless steel bulkhead on the rear of the instrument. This
bulkhead is the outlet for the ozone produced by the model 306. It is to this bulkhead that
you will want to connect the provided connection tubing. Attaching the desired ozone
monitor to the other end of the connection tubing.
connection tubing as the model 306 has an internal overflow T to compensate for
any flow rate differential.
2B Technologies
2100Central Ave Suite 105, Boulder, Colorado 80301 USA
Phone 303-273-0559 Fax 303-277-1812 http://www.twobtech.com
PLEASE READ BEFORE ATTEMPTING
ANY MEASURMENTS WITH THE MODEL 306
DO NOT add an overflow T on the
Model 306 Quick Start Guide Rev B