スイッチ 3onedata IES5028G-4GS-8GCのPDF クイック・インストール・マニュアルをオンラインで閲覧またはダウンロードできます。3onedata IES5028G-4GS-8GC 3 ページ。 Industrial layer 2 ethernet switch
3onedata IES5028G-4GS-8GC にも: クイック・インストール・マニュアル (3 ページ)
IES5028G-4GS-8GC
Industrial Layer 2 Ethernet Switch
Quick Installation Guide
3onedata Co., Ltd.
Address:
3/B, Zone 1, Baiwangxin High Technology
Industrial Park, Song Bai Road, Nanshan
District, Shenzhen, 518108, China
Website:
www.3onedata.com
Tel:
+86 0755-26702688
Fax:
+86 0755-26703485
【Package Checklist】
Please check the integrity of package and accessories while
first using the switch.
1.
Industrial Ethernet switch
3.
Quick installation guide
5.
Rack-mounting lug x2
7.
Software installation CD
9.
Certification
If any of these items are damaged or lost, please contact our
company or dealers, we will solve it ASAP.
【Product Overview】
The product is managed industrial Ethernet switch. The
model is IES5028G-4GS-8GC (4 Gigabit SFP + 8 Gigabit
combo ports + 16 Gigabit copper ports).
【Panel Design】
Front panel
Rear panel
1. Ethernet port indicator
2. Gigabit Combo port
3. Gigabit Ethernet copper port
4. Gigabit SFP port
5. Console port
6. Device running status indicator
7. Restoring factory setting button
8. Alarm indicator
9. Power indicator (P1/P2)
10. Rack-mounting lug
11. Relay 2 output terminal blocks
12. AC power input (P2)
13. Grounding screw
14. AC power input (P1)
15. Relay 1 output terminal block
【Mounting Dimension】
2.
Power line x2
Unit: mm
4.
Serial port line
6.
Foot pad x4
8.
Warranty card
- 1 -
Note:
Don't place or install the device in area near water or moist,
keep the relative humidity of the device surrounding between
5%~95% without condensation.
Before power on, first confirm the supported power supply
specification to avoid over-voltage damaging the device.
The device surface temperature is high after running; please
don't directly contact to avoid scalding.
【Rack-mounting】
This product adopts rack-mounting, mounting steps as
below:
Step 1
Select the device mounting position and ensure
enough mounting size is reserved.
Step 2
Adopt 4 bolts to install the mounting lugs in the
device position as figure below.
Step 3
Place the device in the rack; adopt 4 bolts to fix two
sides mounting lugs in the rack.