- ページ 2
試験装置 Anyload LCT100のPDF ユーザーマニュアルをオンラインで閲覧またはダウンロードできます。Anyload LCT100 4 ページ。 Load cell
1. Connect the load cell cable to the right pins in the connector
2. Make sure that the shield and body are not connected
3. Turn on the unit by pressing on/off key for a few seconds
4. The display will show the welcome screen for a few seconds and
change to ask for load cell type ( 4 or 6 wires )
5. For the most accurate results for the high resistance ( leakage ), this is
the time to run the calibration. Hold both the right key and on/off key,
the display will show Calibrating... After 2 seconds the unit is calibrated
6. Now connect the shield and body ( if available ) to the connector
7. Choose type of Load Cell ( 4 or 6 wires ) and press Enter
8. Choose L/C rated output with the up and down keys and press Enter
9. Press Enter for full testing or, down arrow for continuous display
If continuous mode was chosen:
The LED will blink in various colors and the Load Cell signal will be displayed
continuously in percentage of the full L/C capacity.
For example: applying 10Kg on a 100Kg load cell will show of 10%
Note: To save the battery the unit will shut off after 6 minutes
1 |
ANYLOAD LCT100 Load Cell Tester User's Guide (V1702)
LCT100 Load Cell Tester