- ページ 7

無線アクセスポイント Airwalk EdgePoint PROのPDF リファレンス・マニュアルをオンラインで閲覧またはダウンロードできます。Airwalk EdgePoint PRO 15 ページ。
Airwalk EdgePoint PRO にも: インストレーション・マニュアル (19 ページ)

EdgePoint PRO location requirements: 
EdgePoint PRO location requirements:
Flat 24"x24" wall space so a physical clearance of 5" on all 
sides of the device is observed to ensure efficient operation of 
the cooling fans and antennas
A building support beam for mounting support (recommended)
Access to a AC power source and breakers to accommodate up 
to 15 amps / 120 VAC (ceiling access is recommended)
Access to an Ethernet port to connect the enterprise LAN line 
to the internet backbone (ceiling access is recommended)
Must be 15 ft (5m) from a window that has no metal sheeting 
(
)
with a clear view of the sky
Moderate temperature between 32°F and 122°F
Dry environment with relative humidity between 0 to 95% 
non‐condensing
Equipment needed for installation: 
E i
t
d d f
i t ll ti
Drill or screwdriver with medium Phillips head 
Step ladder to install and connect the cables in most locations  
(most locations)
3 screws size #10 pan head x 2" with washer
p
3 wall anchors optional
1/24/2011
Step One – Select Location
AirWalk Communications Proprietary and Confidential
Ethernet
Ethernet 
connection
g
> 6 ft (2m)
Power 
Power
connection
GPS Antenna
< 15 ft (5m)
Page 7