- ページ 7
無線アクセスポイント Airwalk EdgePoint PROのPDF リファレンス・マニュアルをオンラインで閲覧またはダウンロードできます。Airwalk EdgePoint PRO 15 ページ。
Airwalk EdgePoint PRO にも: インストレーション・マニュアル (19 ページ)
EdgePoint PRO location requirements:
EdgePoint PRO location requirements:
•
Flat 24"x24" wall space so a physical clearance of 5" on all
sides of the device is observed to ensure efficient operation of
the cooling fans and antennas
A building support beam for mounting support (recommended)
•
Access to a AC power source and breakers to accommodate up
•
to 15 amps / 120 VAC (ceiling access is recommended)
Access to an Ethernet port to connect the enterprise LAN line
•
to the internet backbone (ceiling access is recommended)
•
Must be 15 ft (5m) from a window that has no metal sheeting
(
)
with a clear view of the sky
•
Moderate temperature between 32°F and 122°F
•
Dry environment with relative humidity between 0 to 95%
non‐condensing
Equipment needed for installation:
E i
t
d d f
i t ll ti
Drill or screwdriver with medium Phillips head
•
Step ladder to install and connect the cables in most locations
•
(most locations)
3 screws size #10 pan head x 2" with washer
p
•
3 wall anchors optional
•
1/24/2011
Step One – Select Location
AirWalk Communications Proprietary and Confidential
Ethernet
Ethernet
connection
g
> 6 ft (2m)
Power
Power
connection
GPS Antenna
< 15 ft (5m)
Page 7