- ページ 6

オーブン Duke 59 SeriesのPDF 設置および操作マニュアルをオンラインで閲覧またはダウンロードできます。Duke 59 Series 20 ページ。 Ovens with “zp” control panel
Duke 59 Series にも: オーナーズマニュアル (20 ページ)

Duke 59 Series 設置および操作マニュアル
Installation and Operation of 5/9 Electric Convection Oven
INSTALLATION INSTRUCTIONS - continued
D. ELECTRICAL CONNECTIONS
The oven is supplied for connection to a 208 or 240 volt
grounded circuit. The electric motor, indicator lights and
control circuits are connected internally and require no
secondary power supply.
Before making any connections to these units, check
the specification plate to assure that the voltage
and phase of the oven is compatible with the
electrical supply. When installing, all ovens must be
electrically grounded in accordance with local codes
or in the absence of local codes, with the National
Electrical Code, ANSI/NFPA 70 (in Canada – CSA Std.
C22.1). Wiring diagrams are located in the control
compartment area. Standard wiring schematics are
also included at the back of this manual.
TOTAL KW
8.0 KW
8.0 KW
POWER SUPPLY CONNECTION
120001
Block, Terminal 4 Pole
GROUND WIRES
L 1
L 2
153213
SOURCE
L 3
Plug,
WIRES
Ground
L1, L2 & L3 (3PHASE)
L1 & L2 (1PHASE)
6
The proper method of connecting the power source
to the terminal block is shown below.
removal of the Control Panel. This is done by
loosening the three screws located at the bottom
of the door opening and remove lower trim piece.
Then remove the screw at the top of the control
panel and then the control panel will hinge forward.
SPECIFICATIONS
VOLTAGE
208
240
222790
Contactor, 240V 50/60Hz
Note to Electrical Inspector:
Inspection of electrical connection
should be accomplished by the
AMPS-1PHASE
41
36
AMPS-3PHASE
24
21