- ページ 14

室内装飾品 3T-Components 3T-MOTORS 3T45-10BのPDF 据付・取扱説明書をオンラインで閲覧またはダウンロードできます。3T-Components 3T-MOTORS 3T45-10B 20 ページ。 Shutter / awning motors

3T-Components 3T-MOTORS 3T45-10B 据付・取扱説明書
INSTALLATION INSTRUCTIONS
Slide the side bearing with universal bearing onto the support tube & fasten.
Ensure that the motor square spigot is properly engaged in the universal bearing.
Secure the motor square spigot with the supplied cotter pin.
Attach the cover to the side bearing.
Install awning & release fuses.
3.9
Support tube
Side bearing &
Universal bearing

Awning motor wiring:

4
Connect the awning motor and switch (or timer) to the mains.
The electrical connection of the awning motor and control may only be carried out by qualified personnel.
If the drive should run in the opposite direction after installation, the motor's upstream and downstream leads (brown + black) must be turned.
Power grid
230 V / 50 Hz
1) brown / black = L1 / Phase
2) blue = N Neutral conductor
3) green/yellow = PE Protective conductor
Adjustment cable ESK
The connection diagram for the ESK can be found on page 10.
The connection diagram of time switches differs from this
circuit diagram! Please refer to the corresponding manual
for the connection diagram.
>
fig. 3.11
>
fig. 3.12
3.10
1 (L1)
2 (N)
3 (PE)
The white wire is unoccupied and
must be insulated. To do this, push
the enclosed wire end cap onto the
wire end and press it together with
crimping pliers or combination pliers.
>
fig. 3.9
>
fig. 3.10
3.11
Cotter pin
Wire end cap
If the end points are set using the ESK, do not connect the
switch or timer until after the end points have been set
(page 11)!
3.12
Cover
Awning motor
1
230 V / 50 Hz
2 (Up/Down)
3 (Up/Down)
4 (N)
5 (PE)
1) white = Programming cable, not assigned
2) black = Departure or ascent
3) brown = Departure or ascent
4) blue = N Neutral conductor
5) green/yellow = PE Protective conductor
3T-MOTORS Tubular motors | Installation instructions
Side bearing
14