- ページ 3
ボイラー Dunkirk EXCELSIOR SeriesのPDF 使用方法をオンラインで閲覧またはダウンロードできます。Dunkirk EXCELSIOR Series 4 ページ。 Oil fired boiler, knockdown assembly
10.
Attach the burner harness zip tie to right side jacket. If
no hole is present, drill 1/8" dia. See
Attach the lower rear panel. The tabs fit into the slots
11.
in the side panels. Do not attach the upper rear panel.
See
Figure 7.
(Nipples removed for clarity)
KNOCKDOWN BOILER ASSEMBLY
Figure 6
11"
Figure
Figure 7
Attach the front control panel. With the screws provided,
12.
attach the bottom screws, then place the panel onto the
screws using the notches in the panel. See
Then, attach the top using the other two screws.
6.
13.
Tighten down the bolts mentioned step 6.
14.
Attach the 2 hinges to the Top Panel using the snap
rivets. Then, place the top panel over the sides and
the front. Be sure the plastic dowels fit into the holes
on the top of the side panels. (If the flanges cover
holes, re-read step number 2.) See
3
Figure
Figure 8
Figure
9.
Figure 9
8.