- ページ 7
エアコン Duo-Therm 57915.331のPDF 取付説明書をオンラインで閲覧またはダウンロードできます。Duo-Therm 57915.331 17 ページ。 Roof top air conditioner/heat pump
Duo-Therm 57915.331 にも: 据付・取扱説明書 (17 ページ)
A. The Dometic Corporation recommends the basic configuration shown on page 8, for installing this air conditioner/heat pump
system. We have found by testing , that this configuration works best in most applications of this air conditioner/heat pump
system. It is the responsibility of the Installer of this system to review each RV floor plan and determine the following:
1. Duct size
2. Duct layout
3
Register size
4. Register location
5. Thermostat location
These items must be determined in conjunction with the Air Distribution System and Sizing and Design Requirements listed
in the chart on page 6.
Important:
Alternate configurations and methods may be used which still allow the air conditioner/heat pump
to operate properly; however, these alternate configurations and methods must be approved by the Dometic
Corporation in writing. The following instructions are based upon the use of Dometic Return Air Kits 3105007.XXX,
3105935.XXX, or Genesis Air Filtration System 3308120.XXX. The 3107541.XXX and 3107546.XXX has the mounting
bolts supplied for use with these kits.
B. ROOF AND CEILING OPENING PREPARATION
1. A 14-1/4" x 14-1/4" (±1/8") opening must be cut through the roof and ceiling of the RV. This opening must be located
between the roof reinforcing members.
2. Mark a 14-1/4" x 14-1/4" (±1/8") square on the roof and carefully cut the opening.
3. Using the roof opening as a guide, cut the matching hole in the ceiling.
4. The opening created must be framed to provide adequate support and prevent air from being drawn from the roof cavity.
Lumber 3/4" or more in thickness must be used. Remember to provide an entrance hole for power supply wiring and
thermostat cable.
5. The 14-1/4" x 14-1/4" (±1/8") opening is part of the return air system of the air conditioner/heat pump and must be finished
in accordance with NFPA Standard 501C Section 2.7.
6. Route a copper 12 AWG (max. length 24'), with ground, supply line from the fuse or circuit breaker box to the roof opening.
a. This supply line must be located in the front portion of the
b. The power supply MUST be on a separate Time Delay Fuse or HACR Circuit Breaker ( 20 amp for 579, 590, 591,59516
and 600 series and 15 amp for 59529 and 59530.
c. Make sure at least 15" of supply wire extends into the roof opening. This ensures easy connection at the junction
box.
d. Wiring must comply with all National, State and Local Wiring Codes.
e. Use a steel sleeve and a grommet or equivalent methods to protect the wire where it passes into the opening.
7. Route a DEDICATED 12V DC supply line (18–22 AWG) from the RV's converter or battery to the roof opening. See Section
6. Thermostat & Cable Installation, B. Cable Installation.
a.
This supply line must be located in the front portion of the
b.
Make sure that at least 15" of supply wire extends into the roof opening.
5. AIR DISTRIBUTION SYSTEM INSTALLATION
There may be electrical wiring between the
roof and the ceiling. Disconnect 115 volt AC
power cord and the positive (+) 12 volt DC
terminal at the supply battery. Failure to fol-
low this instruction may create a shock haz-
ard causing death or severe personal injury.
ANALOG DUCTED INSTALLATION INSTRUCTIONS
WARNING
!
14-1/4" x 14-1/4" (±1/8")
7
opening.
14-1/4" x 14-1/4" (±1/8")
opening.