- ページ 2
アクセサリー DUROplastic duolite DAP9のPDF 取扱説明書をオンラインで閲覧またはダウンロードできます。DUROplastic duolite DAP9 2 ページ。
Tools required
Contents
1
2
3
1 Bracket x2
3 Back U-channel x1
5 Coach Screw(8x50mm) x2
7 Fisher plug x4
4
5
6
7
8
2 Front C-channel x1
4 Duolite sheet x1
6 Coach Screw (8x75mm) x2
8 Fixing pozi screws (16mm) to
front and back of awning x4
Steps for installation
Slide C- and U-channel onto Duolite sheet.
3
Back U-channel
2
Front C-channel
Step 1
Slide Duolite Multiwall sheet
into brackets and secure.
Step 2.1
Do not remove Aluminium Foil Tape - it
is there to reduce moisture inside flutes
In the event of moisture ingress, remove
foil and blow clear with hair dryer. Close
again with Duck Tape / Foil Tape.
Screw #8 into pre-drilled
holes in the front and back
of bracket
When
connecting 2
or more awnings
together, follow
instructions on
the next page.
Using a spirit level, mark and secure
awning to the wall
Note: #6 Coach screws
for top holes
Note: #5 Coach screws
Step 3
for bottom holes