- ページ 7
ゲートオープナー Elsema iS2000のPDF ユーザーマニュアルをオンラインで閲覧またはダウンロードできます。Elsema iS2000 7 ページ。 High speed sliding gate
opener
elsema’s eclipse
control card with gds operator
Elsema iS2000 にも: ユーザーマニュアル (8 ページ)
5. M
AI NTENANCE
WARNING!
Failure to maintain equipment may result in injury or death and/or damage to property and equipment
Recommended maintenance to be performed on the operator and gate are as follows:-
Operator performs over 150 cycles a day
Operator performs between 100-150 cycles a day
Operator performs between 50-99 cycles a day
Operator performs between 20-49 cycles a day
Operator performs under 20 cycles a day
Date: ..........................................................................................
Site Name: .....................................................................................................................................................
Site Address: ..................................................................................................................................................
Before commencing maintenance on the operator, isolate the electrical supply to ensure operator will not run
inadvertently.
Gate rolls freely when in manual ....................................................................................
Gate wheels and guide rollers in good condition ............................................................
Gate stops are installed and in good condition, not loose ...............................................
Gate rack is tight & correct clearances between pinion wheel & rack............................
Gate track is not damaged ...............................................................................................
Gate operator mounting bolts tight ..................................................................................
No oil leaks from gearboxes ............................................................................................
Gearbox mounting bolts/nuts tight ..................................................................................
Inside operator and control box clean .............................................................................
'Baygon' Surface Spray around operator and control box (not on electronics) ..............
All electrical connections tight ........................................................................................
Limit Switches operate in appropriate positions / chain oiled ........................................
External safety devices work effectively / cleaned .........................................................
Electromagnetic lock, if fitted, operates correctly and is clean ......................................
Wash down of control box and cover (particularly near corrosive/sea environments) ...
General operation i.e. speed, auto close etc normal ........................................................
Comments............................ ..................................................................................................... ......
.........................................................................................................................................................
...........................................................................................................................................................
Service performed by :......................................................................................................................
D
ETAI LS
each month
every 2 month
every 4 months
every 6 months
every 12 months